BuildTechPro — Psychrometric Dry Log

David Goldstein · 11117 Midvale Rd, Kensington, MD 20895
Drying Period: Feb 4–Feb 8, 2026
Project Manager: Ashkan Yazdanian
Cause of Loss: Dishwasher supply line freeze/thaw
Affected Areas: Kitchen, Basement Living Room, Basement Room, Bathroom
Readings: Outdoor Temp, Indoor Temp, Indoor RH (computed: Dew Point, GPP, MRF)
Equipment deployed
3 LGR Dehus · 13 Air Movers
15 dehu-days · 65 fan-days
Drying duration
5 days
Monitoring visits documented
Indoor RH change
Day 1 → Day 5
Indoor GPP change
Moisture removed from air
Affected cubic footage (optional)
Tip: If you enter cubic footage, we can compute CFM targets and show it on-screen.
RH Safe (0–50%) RH Caution (50–60%) RH Risk (60–100%) GPP uses a secondary axis on the right for cleaner scaling.

Daily Readings

Dew Point, GPP, and MRF are computed from your recorded indoor temperature and RH. Outdoor RH was not captured on this data set.
Date Outdoor Temp (°F) Indoor Temp (°F) Indoor RH (%) Indoor Dew Point (°F) Indoor GPP MRF
Computed values assume standard atmospheric pressure. If you track barometric pressure, GPP can be recalculated with higher precision.